- Fitted with genuine heavy duty kverneland tines, 1400mm (55”) long
- Tines are fitted in special machined sleeves
- Suitable for category 1 and 2 linkage
- All pivot points are bushed and fitted with grease nipples
- Hinged gate flap to ensure complete discharge of load
Wylie Engineering Push-Off Buckrake (New)
Push-Off Buckrake
Description
Description
N.B. – Main tube should be set 2”-3” above ground when tine tips are in contact with ground.
CONTRACTOR’S RANGE
- 12 tine heavy duty 7’ 10” wide 575kg
(Main bottom tube 120x120x10mm hollow section) - 14 tine heavy duty 8’ 8” wide 625kg
(Main bottom tube 120x120x10mm hollow section) - 16 tine heavy duty 10’ wide 675kg
(Main bottom tube 120x120x10mm hollow section)